KIM ROMERO Over 20 years
of experience in construction management, project and program scheduling, and
project cost and schedule controls. As a Sr. Scheduler, Mr. Romero has
prepared resource- and cost-loaded master program and project-specific
schedules for College and K-12 educational new construction buildings and facilities,
new sewer, water and wastewater treatment plants, port & harbor civil
projects, recreational facilities, TBM tunneling and military housing
facilities. Kim is also experienced in review of contractors’ baseline and
monthly schedule updates, evaluation of contractors’ requests for time
extension, status reporting, funding allocation monitoring, forecasting, and
earn value analysis, and preparation of owner parallel schedules. Kim is a
certified Primavera user and is proficient in the use and review of state of
the art scheduling software packages including Primavera P6 version 8.3, P3,
Suretrak, Contractor and Microsoft Project. He has successfully completed
projects with private, local, state and federal government owners including
Port of Los Angeles, Port of Long Beach, Department of Water & Power, Los
Angeles Unified School District, Los Angeles Community College District, City
of Los Angeles Bureaus of Engineering, Disney Resort, Metropolitan Water
District, and Army Corps of Engineers. Mr. Romero has provided scheduling for
both Owner and Contractor.
Berth 214 – 220 Redevelopment, Port of Los Angeles, CA SENIOR SCHEDULER CONSULTANT Date: October 2015 to Present As a Senior
Scheduler, Kim Romero is managing the construction schedule for Port of Los
Angeles. The overall budget is approx. $37 million for the Berth 214-220
Redevelopment project. The construction work consist of terminal
improvements, which includes electric dredging, installation of steel sheet
piles, prestressed concrete piles, landside crane rails, concrete girders,
tie beams, AC paving and Maritime Power AMP boxes and electrical work .
Kim will be reviewing the contractor’s baseline and monthly schedule updates,
preparing owner’s parallel schedules, monitoring the Contractors progress and
comparing it to the monthly schedule.
Kim has been preparing the response to the Contractor monthly written
reports. Kim Romero attends weekly progress meetings, verifies the three-week
look-ahead schedules and compares them with the latest baseline and monthly
schedule updates provided by the Contractor. Reviewing of the Contractor Time
Impact Analysis fragnet schedules pertaining to contractor stated delay will
be required when need be.
Caltrans CMGC Pilot Program for Selected Projects SENIOR
SCHEDULER CONSULTANT Date: May 2014 to Present Kim Romero is
currently serving as the Senior Scheduler for the Caltrans CMGC Pilot
Program. The Caltrans CMGC Pilot program includes 6 distinguish projects with
approx. budget of 110 billion dollars. Mr. Romero is involved with
Independent Cost Estimate team (ICE) to provide scheduling services for the
projects. The Caltrans CMGC projects consists of the following
design build and construction projects: ·
Oakland Bay
Bridge Marine Foundation Removal ·
State Route
58 Convert 7.5 Miles 2- Lane Highway to 4- Lane Expressway ·
Reconstruction
of Barton Road at Interchange 215 Freeway ·
Ferguson
Slide Restoration Construction of 2 - Lane Highway on New Alignment at
Yosemite ·
Interstate
5 North Coast Corridor Improvements consisting of approximately 22
Miles of HOV lanes, Rail and Lagoon work in San Diego County
LACCD Los Angeles Mission College, Sylmar, CA SENIOR SCHEDULER CONSULTANT Date: January 2015 –July 2015 As a Senior
Scheduler, Kim Romero is managing the construction schedule for a $18
million Media Arts Building, and campus wide modernization and renovation
projects totaling $15 million for Los Angeles Mission College. The projects
include design-bid-build and design-build contracts for new construction and
modernization/renovation projects from NTP through Commissioning and
Closeout. He is responsible for creating, updating and monitoring the Los
Angeles Mission College master schedule. Also reviewing the contractors’
baseline schedules for conformance with the schedule specification,
monitoring contractors’ daily progress, reviewing and monitoring contractors’
monthly schedule updates, tracking project costs, preparing owner’s Time
Impact Analysis and reviewing the contractor’s requests for time extensions,
preparing cash flow projections and preparing schedule reports. Minnesota DOT
CMGC Program SENIOR
SCHEDULER CONSULTANT Date: March 2015 – November 2015 Kim Romero is
currently serving as the Senior Scheduler for the Minnesota CMGC
Program. The Minnesota DOT CMGC Pilot program includes distinguished Design Build project
with approx. Engineers budget of 90 million dollars. Mr. Romero is involved
with Independent Cost Estimate team (ICE) to provide scheduling services for
the project. The project consists of building a bridge across the
lake in Virginia City, Minnesota, which will include clearing, grubbing,
demolition, abutments, slopes retaining walls, pile driving, column piles,
structural steel, concrete placement, mechanical, electrical and etc. South
Wilmington Grade Separation, Port of Los Angeles, CA SENIOR
SCHEDULER CONSULTANT Date: December 2013 to June 2015 Kim Romero had
served as the Senior Scheduler for the Port of Los Angeles – South Wilmington
Grade Separation with a budget of 50.6 million. The project consist of
constructing an approximately 4,100 foot long grade separation South
Wilmington extending from the Trapac Terminal South of Harbor Bridges
Boulevard near the intersection of Lagoon Avenue to Pier A Street West of the
intersection with Fries Avenue. The project will include demolition and
removals; asbestos abatement; constructing approaches, abutments, slopes,
retaining walls and mechanically stabilized embankment (MSE) walls; driving
precast/pre-stressed concrete piles, placing footings on top of piles,
add 7 foot diameter
column piles on top of footings; constructing viaduct; constructing storm
drain systems; relocating of sewer and water lines; install street lighting;
installing traffic signals; install steel casings; installing landscape
planting and irrigation. Kim is presently providing schedule services for
the project, Kim will be reviewing the contractor’s baseline and monthly
schedule updates, preparing owner’s parallel schedules, monitoring the
Contractors progress and comparing it to the latest approved schedule.
Kim has been preparing the response to the Contractor monthly
written reports. Kim has also
attends weekly progress meetings, verifies the three-week look-ahead
schedules and compares them with the latest baseline and monthly schedule
updates provided by the Contractor. Reviewing of the Contractor Time Impact
Analysis fragnet schedules pertaining to contractor stated delay. Design - Build
EXPO 2 Light Rail Transit Phase 2, Skanska/Rados SENIOR
SCHEDULER CONSULTANT Date: June 2014 to October 2014 Kim Romero is
currently serving as the Senior Scheduler Consultant for the Design - Build
EXPO 2 Light Rail Transit Phase 2 project with a budget of 580 million
dollars for 5 months assignment. The project consists of constructing 6.5
miles and 7 stations of Light Rail transit from the end of Expo 1 to the City
of Santa Monica. Mr. Romero will be providing training, monitor, maintaining
and make recommendations to the current schedule. Analyze Time Impact
Analysis of the electrical subcontractors and fragnets schedule. Anaheim Street
Improvements, Port of Long Beach, CA SENIOR
SCHEDULER CONSULTANT Date: August
2013 to December 2014 Kim Romero had
served as the Senior Scheduler for the Port of Long Beach – Anaheim Street
Improvements with a budget of $ 9.6 million. This project consists of
demolition, removals and re-install for project improvements which will
include concrete curbs, gutters, slabs, asphalt concrete, PCC pavement, base
material, curb ramps, sidewalks, driveways, landscaping and traffic signals.
The project will also include grading, earthwork, providing CMB material on
site, utilities relocations, modifications to the traffic signals, irrigation
and landscaping. Mr. Romero is responsible for reviewing the contractor’s
baseline and monthly schedule updates, monitoring the contractor’s progress
and comparing it to the latest approved schedule and preparing written
reports. He also attends weekly progress meetings, verifies the three-week
look-ahead schedules and compares them with the latest baseline and monthly
schedule updates. Berths B84-B87
Tesoro Facility Improvements, Port of Long Beach, CA SENIOR
SCHEDULER CONSULTANT Date: August 2013 to February 2014 Kim Romero had
served as the Senior Scheduler for the Port of Long Beach – Berths B84 – B87
Tesoro Facility Improvements with a budget of 4.8 million. The project
consists of demolition &, removal of partial marine structures,
demolition & removal of partial fendering system, construct new fendering
system, repair pre-stressed piles with FRP wrap, repair under deck and top
deck concrete spalls , concrete repairs to seal product leakage and construct
of new access bridges. Mr. Romero is responsible for reviewing the
contractor’s baseline and monthly schedule updates, monitoring the
contractor’s progress and comparing it to the latest approved schedule and
preparing written reports. He also attends weekly progress meetings, verifies
the three-week look-ahead schedules and compares them with the latest
baseline and monthly schedule updates.
Los Angeles
Mission College, Sylmar, CA INTERIM PROJECTS CONTROLS MANAGER CONSULTANT Date: April 1, 2013 – October, 2013 As a Project
Controls Manager, Kim Romero manage the budgets and construction schedules
for various projects budgets that total $ 450 million for Los Angeles Mission
College. The projects include design-bid-build and design- build
contracts for new construction and modernization/renovation projects from NTP
through Commissioning and Closeout. He is responsible for creating, updating,
monitoring of budgets and schedules for Los Angeles Mission College master
schedule, assisting the construction managers in placing their project
schedules on the District dashboard for their monthly reports, reviewing the
contractors’ baseline schedules for conformance with the schedule
specification, monitoring contractors’ daily progress, reviewing and
monitoring contractors’ monthly schedule updates, tracking project costs,
preparing owner’s Time Impact Analysis and reviewing the contractors requests
for time extensions, preparing cash flow projections and preparing schedule
reports. Kim also monitors submittals, RFI's, long lead procurements and
field orders that might impact the schedule. Berth 102 –
Rear Backland Development, Port of Los Angeles, CA SENIOR
SCHEDULER CONSULTANT Date: Jan 2013 to February 2014 Kim Romero had
been serving as the Senior Scheduler for the Port of Los Angeles’ Berth 102 –
Rear Backland Development with a budget of $ 29 million. This project
consists of constructing 27 acres backland, which includes reinforced
portland cement concrete paving and trainstainer runways; asphalt concrete
paving; crushed miscellaneous base; grading; sewer system including
boring and jacking under railroad tracks and dewatering; gas distribution
system including boring and jackind under the railroad tracks; storm drain
system including dewatering; electrical, telephone and communications
systems, including
electric rubber tire gantry (ERTG) infrastructure; striping, fencing and
fencing on K-rails. Kim is responsible for reviewing the contractor’s
baseline and monthly schedule updates, preparing owner’s parallel schedule,
monitoring the contractor’s progress and comparing it to the latest approved
schedule and preparing written reports. Kim also attends weekly progress
meetings, verifies the three-week look-ahead schedules and compares them with
the latest baseline and monthly schedule updates. Berth 100 –
Wharf South Extension & Backland Development, Port of Los Angeles, CA SENIOR
SCHEDULER CONSULTANT Date: July 2012 to December 2013 Kim Romero had
been serving as the Senior Scheduler for the Port of Los Angeles’ Berth 100 –
Wharf South Extension with a budget & $ 33 million. This project consists
of construction of a reinforced concrete container wharf and backland area.
The scope of work also includes construction of a rock dike and engineered
fill requiring the installation of wick drains, both underwater and on land, a
surcharge with instrumentation installation and monitoring and paving. Kim is
responsible for reviewing the contractor’s baseline and monthly schedule
updates, preparing owner’s parallel schedule, monitoring the contractor’s
progress and comparing it to the latest approved schedule and preparing
written reports. Kim also attends weekly progress meetings, verifies the
three-week look-ahead schedules and compares them with the latest baseline
and monthly schedule updates. Ultraviolet
(UV) Filtration Facility, Los Angeles Department of Water & Power,
Sylmar, CA SENIOR
SCHEDULER CONSULTANT Date: July 2012-August 2013 Kim Romero provided scheduling services for the design and
construction of a new Ultraviolet (UV) Filtration Facility with a budget of $
66 million, which is the biggest filtration facility West of the Mississippi.
This project is being constructed with the DWP construction workforce. Mr.
Romero’s responsibilities include developing and updating detailed
resource-loaded project schedule, working with DWP Construction team to
optimize schedule and sequencing of activities, equipment staging, resource
planning, procurement activities, and working with Consultant design team to
develop 4-D (NavisWorks) model. Kim provides recommendations for schedule
optimization, which is required due to critical project completion
date.
Los Angeles Unified School District, Porter
Ranch, CA SENIOR SCHEDULER CONSULTANT Date: October 15, 2010 – July, 2012 Kim Romero
provided scheduling services to the Los Angeles Unified School District
Valley Region Span K8 #2 Porter for construction of seven different buildings
totaling 55,000 square feet with a value of $33 million. He was responsible
for reviewing the contractor’s baseline and monthly schedule updates,
preparing owner’s parallel schedule, monitoring the contractor’s progress and
comparing it to the latest approved schedule, reviewing and reporting on the
contractors Time Impact Analysis fragnet schedules, and preparing
written reports. He conducted daily job walks to monitor the contractor’s
progress of work and updated the Owner’s parallel schedule based on the
weekly job walks. Kim also attended weekly progress meetings, verified the
three-week look-ahead schedules and compared them with the monthly schedule
updates.
Los Angeles Mission College, Sylmar, CA SENIOR SCHEDULER CONSULTANT Date: December 20, 2008 – October, 2013 As a Senior
Scheduler, Kim Romero manage the construction schedule for a 30,000 SF and
$42 million Health and PE Fitness Center, a 25,000 SF and $47 million Family
Consumer Studies Building, a 38,000 SF and $77 million East Campus Science
Building, a 22,000 SF and $18 million Media Arts Building, and campus wide
modernization and renovation projects totaling $15 million for Los Angeles
Mission College. The projects include design-bid-build and design-build contracts for
new construction and modernization/renovation projects from NTP thru
Commissioning and Closeout. He is responsible for creating, updating and
monitoring the Los Angeles Mission College master schedule, assisting the
construction managers in placing their project schedules on the District
dashboard for their monthly reports, reviewing the contractors’ baseline
schedules for conformance with the schedule specification, monitoring
contractors’ daily progress, reviewing and monitoring contractors’ monthly
schedule updates, tracking project costs, preparing owner’s Time Impact
Analysis and reviewing the contractors requests for time extensions,
preparing cash flow
projections and preparing schedule reports. Kim also monitors submittals,
RFI's, long lead procurements and field orders that might impact the
schedule. City of Los
Angeles Bureau of Engineering (LABOE), Los Angeles, CA SENIOR SCHEDULER Consultant Date: May 2005- February 2008 Kim Romero
provided scheduling services to LABOE for Lower North Outfall Sewer Rehab
Project valued at $67 million. This project involved sewer renovation which
consisted of bulk cleaning, pressure washing, excavation of shafts,
cast-in-place concrete, and soil injection grouting. Responsibilities
included reviewing baseline schedule and monthly schedule updates for
conformance to the scheduling specifications; evaluating progress of
construction; verifying actual start and finish dates; verifying individual
activity durations and sequencing through reconciliation with the inspector’s
daily logs; and preparing written schedule analysis reports. He monitored
activities that might have interfered with third parties and provided
schedule update information at the weekly jobsite meeting, and also prepared
owners Time Impact Analysis fragnet schedules.
Disney Project Management, Anaheim, CA
SCHEDULER CONSULTANT - Contract Date: November 2004 - May 2005 Kim Romero was
responsible for reviewing the monthly schedules for Steam Train Ride
upgrades, Storefront upgrades, Tiki Room Renovation, Jungle Cruise upgrades
and Splash Mountain rail upgrades at Disneyland Resort for the 50th
Anniversary milestone. This effort included preparing written comments and
recommendations; reviewing contractor construction schedules for conformity
to the specifications, durations, activity logics, and critical activities;
reviewing actual construction progress; attend weekly progress meetings to
provide information to the project managers and the construction manager
regarding progress and
schedule issues. He also created what if schedule analysis due to delays to
late submittals, RFI’s and long lead procurement for this project. U.S. Army Corp
of Engineers Los Angeles District, Los Angeles, CA SCHEDULER -
Contract Date: April 2004 - November 2004 Kim Romero was
assigned to multiple civil and military facility projects, including
waterways, dams, streams, channels, barracks, mess halls, and military
housing valued at over $200 million. In providing scheduling support through
all project development
phases, he developed the project cost and schedule baselines, established
resource loading based on detailed work scope, identified variances,
monitored and updated the cost and schedule status, and provided monthly reporting. He
oversaw a staff of four project control specialists and provided Primavera
schedule training to USACE staff. Los Angeles
Unified School District – District A, Los Angeles, CA OWNER
AUTHORIZED REPRESENTATIVE Date: August 2004 - October 2004 Kim Romero had
acted Owner Authorized Representative for LAUSD renovation and modernization
of 4 elementary schools. For this over $200 million project, Kim managed the
preparation of bid documents, conducting Job-Start meetings, monitoring
contractor’s schedule of values, and developing summary construction
schedules and cash flow diagrams. He also maintained information in
Expedition, including RFI’s, RFP’s, Submittals and Change Orders; processed
contractor payment applications; monitored cost and schedule status; and
conducted weekly progress meetings and job site visits. He was certified as
an OAR through the LAUSD training program. Chevron Commercial Projects, Los Angeles, CA Contract
SCHEDULER Date: May 2004 - October 2004 - Contract Kim Romero
responsibilities included the EPC baseline planning, scheduling updates,
monthly forecasting, cost performance reporting, forecasting project
cost-at-completion, attending weekly project meetings, and providing progress
reporting information to Chevron on this project that valued at $50
million. Hacienda La Puente Unified School District, City of Industry, CA SCHEDULER/DOCUMENT
CONTROLS MANAGER Date: November 2003- June 2004 Kim Romero
Document Controls Manager/Scheduler for the renovation and modernization of
four elementary schools at Hacienda La Puente Unified School District
totaling $125 million. He processed and logged RFI’s, RFP’s, Submittals and
Change Orders into Prolog. He provided cost and schedule analysis to Project
Managers, and reviewed cost and schedule performance baselines against
schedule updates. Kim also provided cost and schedule reporting to the
construction managers, and oversaw a staff of 4 document controls engineers. City of Los
Angeles Department of Public Works, Los Angeles, CA SCHEDULER February 2001- November 2003 Kim Romero was
assigned to the construction of East Central Interceptor Sewer Tunnel Project
which was 10 miles long, which consisted using 4 TBM tunneling equipment and
with valued at $265 million. His services included reviewing baseline
schedules and monthly schedule updates for conformance to the contract
requirements; evaluating progress; verifying actual start and finish dates;
verifying individual activity durations and sequencing through reconciliation
with the inspector’s daily log; identifying critical and sub-critical
activities; and reviewing the contractor’s plan to mitigate delays. He also
reviewed activities that might have interfaced with third parties and
provided schedule update information at the weekly jobsite meeting. Kim also
prepared Time Impact Analysis and reviewed contractors’ requests for time
extensions. Los Angeles
Unified School District SCHEDULER May 2000 to August 2000 As a
Scheduler, Kim Romero was responsible for consulting with the LAUSD consultant
3DI on cost control and scheduling issues. He provided review and analysis
for performance against established baselines vs. the schedule update and
prepared monthly progress updates to LAUSD under BB Bond Program. Los Angeles
Police Department, Los Angeles and Valley 911 Center SCHEDULER July 1999 to April 2000 Kim Romero
provided cost control and scheduling services for the construction of 911
facilities valued at $22 million. Responsibilities included review and
analysis of baseline cost and schedule in comparison to the forecasts,
prepare monthly progress reports to LAPD, and review monthly invoices.
He attended the City of Los Angeles monthly technical steering committee
meetings to report on project schedule and cost status. Metropolitan Water
District SCHEDULER June 1998 to June 1999 Kim Romero
served as scheduler for over $100 million Metropolitan Water District’s dam
renovations at Inland Feeder and San Diego 6. He developed and maintained
construction cost and schedule information at all project phases. Kim was
responsible for cost loading the schedules, monitoring costs, manpower
analysis, performance measurement analysis, resource analysis, overhead and
escalation rates, and implementing requirements to establish Actual
progress versus against baseline. He also prepared weekly and monthly
schedules, performed cost analysis, and prepared reports. North Island
Naval Station Coronado, Long Beach Naval Station, 32nd Street Naval Station
and Camp Pendleton COST ENGINEER/SCHEDULER November 1994 to May 1998 Kim Romero
served as a Cost Engineer and Scheduler for environmental clean - up
construction projects at the Naval Marine facilities. Kim tracked cost and
updated the schedule on a weekly basis for environmental projects related to
soil contamination removal, construction of Vapor Extraction units,
demolition of existing buildings and removal of underground storage tanks at
Long Beach Naval Facility ($11 million), Camp Pendleton ($15 million), North
Island ($20 million), and 32nd Street Naval Station ($11 million). He was
responsible for cost loading schedules, man power analysis; earn value
analysis, tracking costs on a daily basis and developing monthly cost burn
rate, and prepared weekly and monthly schedule and cost analysis reports. Kim
also provided training for newly hired cost engineers and schedulers.